The objective of the term project assignment is to prepare a Bid Proposal for constructing a one-story single family house (MAKU Residence). Students must approach the assignment
April 24, 2024
The objective of the term project assignment is to prepare a Bid Proposal for constructing a one-story single family house (MAKU Residence). Students must approach the assignment from the perspective of a construction contractor attending a bid, and prepare a professional price proposal using their knowledge, skills and common sense. This requires proper efforts with regards to: • Reading and understanding plans; • Recognizing construction work items; • Surveying the quantity for various types of work; • Using cost databases to acquire cost of construction efforts; • Estimating indirect and total cost of construction; and • Submitting and presenting a professional proposal of their cost estimation. General requirements of the proposal are as following: • This is an individual assignment and students will not be allowed to work in groups. • Use the project plans and other reference material posted on Canvas to identify the scope of work in this project and complete the quantity take-off. • Follow the CSI MasterFormat® (2004 Edition) in organizing the cost estimate proposal. • Use the R.S. Means Online website (https://www.rsmeansonline.com) to get cost data for all identified work items. It is the students’ responsibility to follow up on the invitation email to setup an account on the R.S. Means Online website and to inform the instructor immediately if they have not received such email (double check your email spam folder). • In case of any missing or incomplete information, students can make reasonable and justifiable assumptions. All assumptions must be clearly listed in the proper sections of the proposal, as described later in this document
BCN3611-ProjectSheetTemplates.xlsx
BCN3611_ProjectDescriptionMAKUResidence-1.pdf
BCN3611_ProjectPlansMAKUResidence1.pdf
Summary (MasterFormat)
COST SUMMARY (MasterFormat)
DIVISION
MATERIAL
LABOR
EQUIPMENT
TOTAL
01 – General Requirements
03 – Concrete
3,077.80
1,760.50
8.10
4,846.40
04 – Masonry
05 – Metals
06 – Wood
07 – Thermal and Moisture Protection
08 – Openings
09 – Finishes
11 – Equipment
22 – Plumbing
23 – Heating, Ventilating, and Air-Conditioning (HVAC)
26 – Electrical
31 – Earthwork
32 – Exterior Improvements
GRAND TOTAL
$3,077.80
$1,760.50
$8.10
$4,846.40
Summary (Uniformat II)
COST SUMMARY (UNIFORMAT II)
Gross Floor Area
GSF =
2250
Division
Breakdown
$/GSF
Cost
A Substructure
A10 – Foundations
2.15
4,846.40
A20 – Basement Construction
B Shell
B10 – Superstructure
B20 – Exterior Closure
B30 – Roofing
C Interiors
C10 – Interior Construction
C20 – Stairs
C30 – Interior Finishes
D Services
D10 – Conveying
D20 – Plumbing
D30 – HVAC
D40 – Fire Protection
D50 – Electrical
E Equipment and Furnishings
E10 – Equipment
E20 – Furnishings
F Special Construction and Demolition
F10 – Special Construction
F20 – Selective Building Demo
G Sitework and Utilities
G10 – Site Preparations
G20 – Site Improvements
G30 – Site Civil/Mech. Utilities
G40 – Site Electrical Utilities
G90 – Other Site Construction
Z General Conditions, Overhead, and Profit
Z10 – General Conditions
Z20 – Other Indirect Costs
Z30 – Contractor’s Fees (Profit)
GRAND TOTAL
2.15
4,846.40
Div. 3
DIVISION 03 – CONCRETE
RS Means Item